Raymond Limited (JALGAON) Global Energy Management implementation case study
Raymond Limited (Jalgaon) achieved coal savings up to 208 Tons (September 2015 to January 2016) through the replacement of inefficient 10 TPH boiler with 6 TPH boiler.