PT Pembangkitan Jawa Bali Unit Bisnis Jasa Operation & Maintenance PLTU Indramayu Global Energy Management implementation case study

Coal Fired Power Plant with 3 x 330 MW in capacity, has implemented ISO 50001 since 2015 and achieved USD 46,110,418.91 in cost savings through EnMS.

Indramayu Coal Fired Power Plant (Indramayu CFPP), owned by PT PLN (Persero) as national electric company, managed and operated by PT Pembangkitan Jawa Bali (PT PJB, as subsidiary of PT PLN (Persero)) is located in West‐Java, Indonesia. Indramayu CFPP has reduced cumulative 6% energy intensity equal to US$ 46,110,418.91 energy cost savings in 2015‐2019 (4.95 times of implementation cost), which is 1.46% better than the energy efficiency road map (5 years plan) target for 2019.