LinkedIn

twitter

YouTube

Loreal Argentina S.A. Global Energy Management Implementation Case Study

Site: Distribution Center

L’Oréal Argentina Distribution Centre’s main activities involve reception, storage, preparation, and dispatch of cosmetic products. These activities were carried out from 2003 at Garín, Buenos Aires Province, Argentina. In 2019 it was moved to the new site at Benavidez built under LEED requirements and which obtained the Platinum Certificate in 2021. In 2021, the site obtained the ISO 14.001, ISO 45.001 and ISO 50.001 Certifications.

loreal2